WATER SUMP WITH RCC METHOD :

1. AREA MEASURING FOR REQUIREMENT LITERS
2. EXCAVATION OF FOOTING
3. PCC FOR FOOTING
4. FOOTING STEEL PREPARATION AND PLACING DOUBLE MATT WITH CONCRETE
5. 4.5 INCH BRICK WORK REQUIREMENTHEIGHT OUTER SIDE
6. DOUBLE MATT FOR FOUR SIDE VERTICAL POSITION
7. ROOF SHUTTERING WORK INNER FOUR SIDE
8. ROOF CONCRETE FULL FILL
9. REMOVE SHUTTERING
10. STEPS FIXING
11. PLASTERING WORK WITH WATERPROOF CHEMILCAL
12. WATER CURING
13. OVERHEAD RCC ROOF AND 2X2 MANHOLE COVER